OPS

Operations

Features

All 14 Features

Every feature in Operations is built for daily maritime work — simple to use, fast to navigate, and fully integrated with the rest of Navatom.

01

Issue Gate with Readiness Checks

Only the Issuing Officer can issue a permit, and Issue is refused while anything its permit type requires is missing. Red messages under the status steps name each gap, so the crew know exactly what to fix before the work starts.

  • Gas test missing, failed or out of date
  • Isolations not yet applied and verified
  • Risk assessment not completed, or its worst residual risk stops the work
  • Required checklist questions unanswered, or a precaution answered No
  • A required role has not signed at Issuance

02

Simultaneous Operations Control

Conflict rules on each permit type name the work it must not run alongside: a work category, another permit type, an operation category or an operation. A rule can block the permit or warn, for the same ship section or anywhere on board, and only crew with the override right can proceed past a warning.

  • Block or Warn on each conflict rule
  • Same ship section or whole-vessel scope
  • Override Work Permit Conflicts access right
  • Board of Active and Suspended permits by ship section

03

Step-by-Step Operation Runs

On board, the crew create a run from the operation definition, answer which conditional steps apply today, and start it. Steps unlock stage by stage, risk assessment and work permit steps complete only when their record is ready, and the run completes when every step that applies is done.

  • Run numbers such as OP 00012
  • Planned, In Progress, On Hold, Completed and Cancelled
  • Starting a run starts its risk assessments and drafts its work permits
  • Runs started from a maintenance job show their origin

04

Digital Permit to Work

Raise a work permit on board for each hazardous job, at one place and for a set time, from the permit types the office defines. The permit names the people who take part, links the job’s risk assessment, and records the gas tests, isolations, checklist answers and signatures the job needs.

  • Ten statuses from Draft to Closed, shown as steps on the permit
  • Permit numbers such as WP 00008, given on issue
  • Current and Archived lists, and a Board of the permits in force
  • Hold, Resume, Extend, Handoff and Cancel, each in the event history

05

Gas Testing with Safe Limits

Each permit type sets the gases to test, their minimum and maximum safe values, and how long a passing reading stays valid. The Gas Tester records each round with its sample point and instrument, and a failed or expired reading blocks issue until the air is tested again.

  • Oxygen, LEL, hydrogen sulphide, carbon monoxide and carbon dioxide
  • Retest interval per gas, one hour when none is set
  • Continuous monitoring for gases watched all through the work
  • Only the assigned Gas Tester records readings

06

Energy Isolation and Lock-Out

Record an isolation point for each energy source cut off before the work, apply it with its lock-out tag number, and have a second person verify it. The permit type names the energy types that must be covered and the least secure isolation method it accepts.

  • Nine energy types, from electrical and hydraulic to gravity and stored pressure
  • Nine isolation methods, from physical disconnection and spades to electrical lock-out
  • Positive, proved and non-proved isolation security
  • A permit can’t be closed until every point is removed

07

Signatory Matrix by Role and Stage

Each permit type sets which roles sign, at which of six stages, and which ranks may hold each role. A permit can’t move past a stage until every role required there has signed.

  • Seven roles, from Authorising Officer and Issuing Officer to Gas Tester and Fire Watch
  • Approval, Issuance, Extension, Handover, Completion and Closure stages
  • Any assigned or Every assigned signing
  • Rank filters for who may hold each role
  • Optional wet signature on the printed permit

08

Enclosed Space Entry and Attendance

For enclosed spaces, the permit logs each person going in and coming out, so everyone knows who is still inside. A permit with anyone still inside can’t be closed, and an enclosed space entry permit lasts eight hours at most.

  • Entry and exit time for each Performing Person
  • Inside until each person is checked out
  • Standby Person and Fire Watch can’t also be Performing Persons
  • Post-work monitoring time before closure

09

Handover, Extension and Suspension

At a change of watch, Handoff passes the permit to the incoming team, with their names, a briefing confirmation and the Handover signatures. Extend gives more time within the type’s maximum validity and number of extensions, and Hold stops the work until Resume.

  • Incoming people named for each role
  • Risk assessment confirmed still valid at handover
  • Maximum validity and maximum extensions per permit type
  • Expired by the system when Valid To passes

10

Operation Definitions and Procedures

The office writes down how each operation is done on board, such as bunkering or a pilot boarding: its steps in order, who is responsible, its checklists and the risk assessment template every run starts from. Definitions are sorted into operation categories, published as versions and offered to the ship groups they apply to.

  • Eight step types, from instruction and briefing to work permit and sign off
  • Mandatory and conditional steps
  • Steps grouped into stages, such as preparation and transfer
  • Vessels work from the last published version

11

Permit Type Library

Work permit definitions set what every permit of a type needs: work category, ship groups, validity, risk assessment, isolation, attendance log, post-work monitoring, gas limits, conflict rules and a checklist. A permit copies its definition when it is created, so a later change never alters a permit in progress.

  • 15 work categories, from enclosed space entry and hot work to diving
  • Risk assessment Required, Not Required, or The Permit Is the Risk Assessment
  • Checklist questions under categories, optional or required
  • Draft, Active and Archived, by ship group

12

Risk Assessment and Maintenance Links

A permit links the completed risk assessment of its job, and Issue checks that assessment’s worst residual risk. In the Planned Maintenance System, a maintenance job’s work control names the permit type, operation or risk assessment the job needs.

  • Risk assessment status and worst residual risk checked at issue
  • A risk assessment template on each operation definition
  • Maintenance jobs linked to permit types and operations
  • Related maintenances listed on each permit type

13

Office Oversight Across the Fleet

Superintendents follow every vessel’s operation runs and work permits on the company app, and open each one with its gas readings, isolations, signatures and history. Permits and runs are issued and signed on the vessel, so the office sees exactly what the crew recorded.

  • Current and Archived lists for permits and runs
  • Read-only on the company app
  • Comments, attachments and events on every permit and run
  • Ship groups decide which vessels get each definition

14

Fleet KPIs for Permits and Operations

The KPI board measures permits and operations across the fleet, from permit flow and validity to gas testing, isolation and the people who sign.

  • Permit volume, flow and validity
  • Gas testing, enclosed spaces and energy isolation
  • Roles, signatures, risk and checklists
  • Simultaneous work, operation runs and procedure governance

Technical

Under the Hood

Architecture and engineering behind Operations — data handling, real-time sync, and interface design.

Status-Driven Permit Lifecycle

Ten permit statuses with the actions each allows, refused server-side when a role, a signature or a readiness check is missing.

Readiness Rules at Issue

Gas, isolation, risk assessment, checklist, signature, personnel, validity and conflict checks run together, and each failing rule is named on the permit.

Definitions Copied into Each Permit

A permit keeps the definition it was created from, so a change ashore reaches only the permits raised after it.

Versioned Operation Definitions

Runs take the steps of the last published version and keep them even when the definition changes later.

Stage-Gated Steps

Each stage unlocks when every applicable step before it is completed; risk assessment and permit steps wait for their records.

Ship-Side Execution, Office Visibility

Runs and permits are worked on the ship app and read on the company app, with access rights for permit types and conflict overrides.

Same Category

Related Modules

Other Operation modules that integrate with Operations.

The ship's electronic logbook: log each event once, and it lands in every record book it belongs to.

Record every voyage from departure to arrival, and report its emissions for EU MRV, IMO DCS and CII.

Ready to try Operations?

Start your free trial today and see how Operations fits into your fleet operations.